Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 401–410 of 444 results
  1. The aim of the renovation and extension of the swimming pool building is to maintain its unique appearance. The new extension is designed to match the look of the original building, so that the main...

  2. Piispankallio area of employment and sports

    Urban projects / Local detailed plans

    The area to be planned is currently undeveloped. It has been zoned as a block area for office buildings. The aim of the amendment to the local detailed plan is to additionally allow the construction...

  3. Tuomarila allotment area

    Urban projects / Parks

    The final refurbishment plan for the Tuomarila allotment area has now been prepared and the construction of the area is now completed in November 2023. Next, the tenants who are continuing in the...

  4. Kalajärvenranta, park area

    Urban projects / Parks

    Espoo Public Works has initiated the planning of the Kalajärvenranta park area. The park planning efforts are related to the construction of three streets: Kalajärvenkallio, Järvenkallionkuja and...

  5. Veininmäki outdoor route

    Urban projects / Parks

    Espoo’s Public Works Department has started planning a recreational route in Veininmäki, Laaksolahti.

  6. Tapiola bridge

    Urban projects / Streets and traffic

    The City of Espoo will commission plans for the replacement of the Tapiola bridge. On the bridge, Tapiolantie goes across Länsiväylä (National road 51). The bridge was completed in 1963 and broadened...

  7. Miestentie

    Urban projects / Streets and traffic

    Wiring transfers and minor street modifications due to construction work on a plot will be carried out in the area around Miestentie and Tekniikantie. The construction work will be carried out in...

  8. Linjaloistonkatu

    Urban projects / Streets and traffic

    Planning work for Linjaloistonkatu is expected to start in 2022. Plans will be drawn up for the undeveloped part of the end of the street. Kerbs, a connection for non-motorised traffic, stormwater...

  9. A pedestrian path will be built along Suopurontie, providing access from Kirvespolku to Niipperintie. The path will be separated from the road with a kerb. The work is estimated to take place in the...

  10. Haukitie

    Urban projects / Streets and traffic

    The construction plans for Haukitie will be drawn up on the basis of the existing street plan. Haukitie will be renovated and a pocket parking space will be added on the north side of the street....

PreviousNext
  1. 1
  2. 40
  3. 41
  4. 42
  5. 45