Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 1–10 of 37 results
  1. Cycling route from Majurinpolku to Vanha Bergansintie

    Urban projects / Local detailed plansParticipate 21.9.-20.10.2026

    A new cycling route section is being planned for Perkkaa, near Ring I. The plan amendment will improve the connections for pedestrian and bicycle traffic. The plan proposal is available for public...

  2. Friisinmäki area of employment and sports

    Urban projects / Local detailed plansParticipate 21.9.-20.10.2026

    The aim of the amendment to the detailed plan is to change the mainly unimplemented detailed plan areas into areas where workplaces and sports facilities will be constructed. The area affected by the...

  3. A moderate increase of the permitted building volume on Hempontie

    Urban projects / Local detailed plansParticipate 21.9.-20.10.2026

    It is proposed that the permitted building volume of two blocks on Hempontie in Pohjois-Leppävaara will be increased to the level of the surrounding area so that the green nature of the area and...

  4. New cycling route for Perkkaa

    Urban projects / Local detailed plansParticipate 21.9.-20.10.2026

    A new section of the cycling corridor along Ring Road I is being planned in Perkkaa. The plan amendment will help improve connections for pedestrians and cyclists. The plan amendment for Pikkukirkko...

  5. Electric substation in Sepänkylä

    Urban projects / Local detailed plans

    A Caruna electric substation is planned for Sepänkylä to secure the electricity network in central Espoo. The substation will be located between the Tuomarila interchange ramp on Turunväylä and...

  6. Protection of old buildings in Jupperi

    Urban projects / Local detailed plans

    What the amendment to the detailed plan aims to do is protect the old buildings on the property and change the use of shore-side plot from a beach to a block area. There are no plans for new...

  7. Southern Viherlaakso

    Urban projects / Local detailed plans

    The local detailed plan’s amendment area is located in Viherlaakso, Kuusiniemi. The area has a memory service centre, a former home economics college and two old residential buildings (block 61081,...

  8. School Center in Karaniitty

    Urban projects / Local detailed plans

    The service network in the Kera area is being developed. The block reserved for schools and day-care centres on Karaniityntie will be expanded. The unbuilt block reserved for workplaces in the...

  9. Service facility for the elderly in Ingas

    Urban projects / Local detailed plans

    A service facility for the elderly is being planned for the corner of Ingaksentie and Kappalaisentie. The participation and assessment scheme and preparation material are available for public review...

  10. The preparation of the plan area has been discontinued. In the block area located by the intersection of Ring I and Mäkkylän puistotie, a plan amendment was supposed to enable the construction of...

Next
  1. 1
  2. 2
  3. 3
  4. 4