Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 31–40 of 96 results
  1. Espoo Master Plan 2060

    Urban projects / Master plans

    A city-wide master plan for 2060 will be drawn up for Espoo. It will anticipate the development of the city in the coming decades. The plan was initiated on 7 September 2022 and its objectives were...

  2. Kuuttipuisto playground

    Urban projects / Parks

    Espoo’s Public Works Department has drawn up a renovation plan for the Kuuttipuiston playground. The aim is to replace the playground structures, equipment and lighting during 2025 and 2026.

  3. The ten-year period of the current playground programme ends at the end of 2025. A new playground programme will be drawn up together with children, young people and adults, and it will provide...

  4. Hannusranta

    Urban projects / Streets and traffic

    The plan amendment will allow the area with low-density housing near the current Kaitaa metro station to be converted into an urban area with blocks of flats. The streets of the Hannusranta plan area...

  5. Housing construction in Tiiliskivenpolku

    Urban projects / Local detailed plans

    Housing construction is planned for the industrial property in the Kiviruukki area. The planning will take the goals of the component master plan as well as the connection to the current and future...

  6. Espoo’s Public Works Department is preparing a park plan for the Halkoranta waterfront walkway, and the plan will concern part of the Halkoranta park area in Soukka.

  7. Espoo’s Public Works Department has drawn up a park plan for Iivisniemenpuisto and Iivisniemenpelto.

  8. Korpikallio

    Urban projects / Streets and traffic

    The City of Espoo’s Public Works Department is planning a street called Korpikallio between Ylätie and Korpikuja. The aim is to renovate the roadway, plan a pedestrian and bicycle lane still missing...

  9. Sammalvuori

    Urban projects / Local detailed plans

    The aim of the local detailed plan is to zone the Sammalvuori area mainly for recreational use. Additionally, the option of building more housing units around the western edges of the area will be...

  10. District heating pumping station on Riilahdentie

    Urban projects / Local detailed plans

    The amendment to the local detailed plan makes it possible to place a district heating pumping station in Kaitaa. The planning will take account of integrating the building into its surrounding green...

PreviousNext
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 10