Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 451–460 of 474 results
  1. Niittyportti

    Urban projects / Streets and traffic

    The City of Espoo Public Works Department has started preparing a street plan for Niittyportti. The street called Niittyportti is currently missing a pedestrian and bicycle way between Haukilahdentie...

  2. Peijinkuja is a new side street, its eastern end has a turning point and parking spots. The street’s combined sidewalk and cycle path will continue through Peijinkulma to Kaitaantie. Peijinkuja’s...

  3. The city of Espoo is exploring new locations for workout stairs. Do you have an idea for a suitable location? Suggest a location by marking it on the survey map! The survey is open from 3 August to...

  4. Takkavitsankuja

    Urban projects / Streets and traffic

    At present, Takkavitsankuja is approximately 120-m long and 4.5-m wide residential, dead-end street with gravel surfacing in a single-family house area. Street drainage is implemented with the help...

  5. Kalajärvenranta, park area

    Urban projects / Parks

    Espoo Public Works has initiated the planning of the Kalajärvenranta park area. The park planning efforts are related to the construction of three streets: Kalajärvenkallio, Järvenkallionkuja and...

  6. Haukitie

    Urban projects / Streets and traffic

    The construction plans for Haukitie will be drawn up on the basis of the existing street plan. Haukitie will be renovated and a pocket parking space will be added on the north side of the street....

  7. A pedestrian path will be built along Suopurontie, providing access from Kirvespolku to Niipperintie. The path will be separated from the road with a kerb. The work is estimated to take place in the...

  8. Renovation of Meritori

    Urban projects / Parks

    Espoo’s Public works department has begun creating a master plan level renovation plan for Meritori and light traffic ways connected to it.

  9. The Soukka residents' park is being refurbished. The aim of the park planning is to develop the park's functions and strengthen its innate character.

  10. Plan amendment that aims to include the expropriated alluvial area in the block area's property boundary as per the detailed plan.

PreviousNext
  1. 1
  2. 45
  3. 46
  4. 47
  5. 48