Malminhaka bridge
Streets and trafficEspoonlahtiPhase
Construction
Project description
The construction project involves the demolition of the current wooden bridge and the construction of a new reinforced concrete slab bridge.
The site will have reinforced access embankments, enhanced water supply and lighting. The work includes converting the 20 kV overhead line to underground cable and horizontal directional drilling for a 110 mm water main, as well as drilled piling.
Basic project information
Implementation time: 4/2026–12/2026
Main contractor: Uudenmaan Infrapalvelut Oy
City developer’s representative: Osmo Tiililä