Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 421–430 of 459 results
  1. Viiskorpi centre

    Urban projects / Local detailed plans

    The preparation of the plan has been discontinued 15.1.2026. The detailed plan process will be restarted from the beginning.

  2. Säästötammi

    Urban projects / Local detailed plans

    A private landowner is planning to replace an existing residential building with a new residential building and commercial premises as part of Ainoa Shopping Centre.

  3. Detached housing in Metsämaa and Odilampi

    Urban projects / Local detailed plans

    The detailed plan develops the existing residential area and protects the natural and environmental values of the area. The objectives of the detailed plan will be prepared in 2026–2027.

  4. Services and recreation on Otsolahti's western shore

    Urban projects / Local detailed plans

    The zoning change will explore the feasibility of increasing services and recreational opportunities on Otsolahti's western shore.

  5. Subterranean rock depot for commuter trains

    Urban projects / Local detailed plans

    The city is investigating the placement of an underground rock depot for commuter trains and its above-ground rail and maintenance connections in the Kauklahdenmetsä area (previously referred to as...

  6. Koronakulma I

    Urban projects / Streets and traffic

    The planning area includes the Koronakatu turnaround area, Koronakuja, Koronapolku, Kuitinmäenaukio square, Kuitinmäenraitti between Kuitinmäenaukio square and Kuitinmäentie as well as the...

  7. Kuusisaarentie pedestrian and bicycle route

    Urban projects / Streets and traffic

    Pedestrian and bicycle route renovation will be planned and implemented, and paving and plants will be added between the plot and the street. The pedestrian and bicycle route will be widened and its...

  8. Streets connected to Espoonlahti centre

    Urban projects / Streets and traffic
  9. Vermonrinne

    Urban projects / Streets and traffic

    A need for change has been discovered in the 19 May 2016 Vermonrinne street plan. The Technical Services Committee approved the plans on 27 April 2022.

  10. Peijinkatu, Peijinkuja, Hannuksenkuja, Finnoonkallio, Hannuksenpuisto, Jerikonpolku and Peijinkulma have been built according to the plans of the first construction phase. Peijinpolku and...

PreviousNext
  1. 1
  2. 42
  3. 43
  4. 44
  5. 45
  6. 46