Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 251–260 of 474 results
  1. Koivuhovinreitti

    Urban projects / Parks

    As part of Rantaradanbaana, Espoo is planning to build Koivuhovinreitti, an easy and safe route for cyclists and pedestrians. A stormwater retention basin will be built in the same area. Construction...

  2. Kilonkartanonreitti

    Urban projects / Parks

    As part of Rantaradanbaana, Espoo is planning to build Kilonkartanonreitti, an easy and safe route for cyclists and pedestrians. Construction is scheduled to take place within the same timeframe as...

  3. The City of Espoo has launched demolition plans for the outdoor exercise area in Nimismiehenpuisto park. The demolition will be carried out in accordance with the City of Espoo neighbourhood sports...

  4. The planning of the renovation of the Koivu-Mankkaa allotment area has started. The planning will proceed with the identification of problems in the area, an information event and the preparation of...

  5. Eastern part of Lekkerikuja and Vanha Leilitie

    Urban projects / Streets and traffic

    Espoo Public Works has started drawing up street and park plans for the eastern part of Lekkerikuja and Vanha Leilitie. The work is related to the development of land use in the zoning area of...

  6. Complementary building in Tietäjänkulma

    Urban projects / Local detailed plans

    The aim of the amendment to the local detailed plan is to construct residential blocks of flats on the plot currently occupied by Sito’s building on Kalevalantie. The amendment will allow more homes...

  7. Merenkulkijanpolku

    Urban projects / Streets and traffic

    In the Espoonlahden keskus plan amendment, Merenkulkijanpolku has been turned into a low-speed residential street. Traffic, pedestrian and parking arrangements will be changed in the street plan to...

  8. Pellaksenhaka Playground

    Urban projects / Parks

    The planning of the new Pellaksenhaka playground has finished. The building of the playground is in line with Espoo’s playground programme 2016–2026.

  9. The objective of the amendment to the local detailed plan is to convert the commercial and office building, which is of architectural value, into a residential building. The external dimensions of...

  10. Åminne manor house

    Urban projects / Local detailed plans

    The objective of the amendment to the local detailed plan is to change the intended use of the Åminne manor house in Kurttila. At the moment, the block in which the manor house is located is...

PreviousNext
  1. 1
  2. 25
  3. 26
  4. 27
  5. 48