The location of the new Pellaksenhaka playground

Pellaksenhaka Playground

ParksEspoon keskus

The planning of the new Pellaksenhaka playground has finished. The building of the playground is in line with Espoo’s playground programme 2016–2026.

Location

Pellaksenmetsänpolku

Phase

Design

The final plan is now finished and it can be found attached to this page under Downloadable files (in Finnish). Also attached is the report containing the resident feedback received for the draft plan and based on which the final plan was drawn up (in Finnish).

The playground will be built during 2023 and the surface of the arena will be completed in 2024.

Contact information

Annika Kemppainen

Horticultural Designer +358 40 6394373Tekniikantie 15, Otaniemi