Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 151–160 of 459 results
  1. Everstinkatu, Everstinkuja and Everstinpuisto

    Urban projects / Streets and traffic

    Espoo’s Public Works Department has started preparing the street and park plans for the Perkkaa I, Perkkaa III and Perkkaa IV detailed plan areas. The aim is to improve road safety in the area and to...

  2. Planning of the Tähtimöpuisto playground has been finished in line with Espoo’s playground programme 2016–2026. The playground equipment will be demolished after Nurmilinnunpuisto has been built at...

  3. Lillhemtinpiha

    Urban projects / Local detailed plans

    The objective of the City of Espoo is to convert the current blocks for public buildings into blocks for detached and semi-detached houses and service buildings. The area is located in Henttaa, at...

  4. The City of Espoo has finalised the demolition plan for the Iltaruskonpuisto playground in line with Espoo’s playground programme 2016–2026. The playground will be demolished in the fall of 2025.

  5. Espoo’s Public Works Department has started planning streets and parks in the Mulby and Åminne detailed plan areas. The streets in the area are mainly existing residential streets that will be...

  6. Housing construction in Tiiliskivenpolku

    Urban projects / Local detailed plans

    Housing construction is planned for the industrial property in the Kiviruukki area. The planning will take the goals of the component master plan as well as the connection to the current and future...

  7. The city is planning an area for detached and semi-detached houses along Niipperintie. The objective of the amendment to the local detailed plan is to develop the old, sparsely built residential...

  8. Korpikallio

    Urban projects / Streets and traffic

    The City of Espoo’s Public Works Department is planning a street called Korpikallio between Ylätie and Korpikuja. The aim is to renovate the roadway, plan a pedestrian and bicycle lane still missing...

  9. Espoontori shopping centre

    Urban projects / Local detailed plans

    The objective of the amendment to the local detailed plan is to facilitate the expansion of the Espoontori shopping centre. The plan has entered into force 29.10.2025. City Council has approved the...

  10. Espoo’s Public Works Department is preparing a park plan for the Halkoranta waterfront walkway, and the plan will concern part of the Halkoranta park area in Soukka.

PreviousNext
  1. 1
  2. 15
  3. 16
  4. 17
  5. 46