Search the site

Filter your search

Narrow your search with the options below. The results are updated automatically after each selection.

Results

Showing 431–440 of 444 results
  1. Velskola village area

    Urban projects / Local detailed plans

    The objective of the local detailed plan is to develop the area of the recreation camp of the Espoo Parish Union and the detached and semi-detached housing around Velskolantie. The preparation has...

  2. The Espoo Public Works Department will be drafting a park plan to serve the waterfront walkway for the following areas: southwestern section of Kallvikinniitty, Kallvikinlahti and Kallvikinranta.

  3. Housing, services and jobs in Kilo

    Urban projects / Local detailed plans

    The plan site is located in Kilo Nihtisilta,The plan amendment will enable housing, services and jobs in accordance with the Kera partial master plan. The office building currently located in the...

  4. Pitäjänmäenkiila’s blocks of flats

    Urban projects / Local detailed plans

    The local detailed plan amendment site is located in Mäkkylä, by the border with Helsinki. The area of industrial, office and storage buildings between Turuntie and the railway line will be turned...

  5. Lankasuo excavation, stage 1A

    Urban projects / Building
  6. Tiistilänraitti plan amendment

    Urban projects / Local detailed plans

    An application for an exemption permit was submitted for the Tiistinlaakso (311802) regarding the protection of the flying squirrel. The purpose of the Tiistilänraitti plan amendment was to improve...

  7. Orkesterinmäki residential area

    Urban projects / Local detailed plans

    The preparation of the plan has been discontinued by decision of the City Board on 9 February 2026. The detailed plan process will be restarted from the beginning because the plan was not compatible...

  8. Nepperi II residential area

    Urban projects / Local detailed plans

    The preparation has been discontinued by decision of the City Planning Committee on 25 February 2026. The preparation has been discontinued by decision of the City Planning Committee on 25 February...

  9. Blocks of flats in Erik Bassen tie area

    Urban projects / Local detailed plans

    The City Planning Committee decided on 25 February 2026 that the detailed plan, where a plan would have been prepared for the high-rise buildings that have already been built along Erik Bassen tie,...

  10. Latopelto area for detached and semi-detached houses

    Urban projects / Local detailed plans

    The preparation of the plan has been discontinued 15.1.2026. The detailed plan process will be restarted from the beginning.

PreviousNext
  1. 1
  2. 43
  3. 44
  4. 45