Rälssitilankatu, Olarinluoma, Gräsantori and Riihitontuntie
Streets and trafficTapiolaThe City of Espoo Public Works Department has started drawing up a street plan for the streets in the detailed plan areas of Riihitonttu and Gräsantori. The work is related to the detailed plan change and applies to the following streets: Rälssitilankatu, Olarinluoma, the western part of Riihitontuntie and the Gräsantori square. The Technical Services Committee approved the plans on 31 January 2024.
Location
Phase
Legally valid
The work will focus on improving traffic safety on the existing streets and the pedestrian and cycling connections. The cross-sections and lane arrangements of the streets will be changed from the current one. The intersection of Rälssitilankatu, Olarinluoma and Riihitontuntie will be a roundabout. Trees and shrubs will be planted on the separators and sidestrips of the streets and walkways. Water supply, telecommunications and energy network lines will be built in the street area.
Gräsantori is a new square formed on the site of a former service station plot in accordance with the plan change. The square will be green with plenty of trees and shrubs. An artwork will be placed in the southwestern part of the square. The square has a reservation for a kiosk/restaurant building. There will be a parking area in the northern part of the square.
The draft plan will be open for comments in the otakantaa.fi service from 2.10.2023 to 16.10.2023. Click this link to access the otakantaa.fi service.(external link, opens in a new window)
After the draft phase, the finalised street plan proposal will be presented publicly towards the end of 2023. The parties concerned will be notified by letter of the presentation in public.
The Technical Services Committee approved the plans on 31 January 2024.
Street construction is expected to begin in 2026.