Search the site

Filter your search

Narrow your search with the options below.

Search filterContent type
Search filterGreater area
Search filterType
Search filterPhase

Results

Showing 1–10 of 79 results
  1. Korpikallio

    Urban projects / Streets and trafficParticipate 17.4.-12.5.2024

    The City of Espoo’s Public Works Department is planning a street called Korpikallio between Ylätie and Korpikuja. The aim is to renovate the roadway, plan a pedestrian and bicycle lane still missing...

  2. Hannusranta

    Urban projects / Streets and trafficParticipate 13.5.2024

    The plan amendment will allow the area with low-density housing near the current Kaitaa metro station to be converted into an urban area with blocks of flats. The streets of the Hannusranta plan area...

  3. Housing construction in Tiiliskivenpolku

    Urban projects / Local detailed plans

    Housing construction is planned for the industrial property in the Kiviruukki area. The planning will take the goals of the component master plan as well as the connection to the current and future...

  4. Plan amendment in Hannuksenpelto

    Urban projects / Local detailed plans

    The aim of the amendment to the detailed plan is to enable, in addition to specialty shop that requires space, exercises facilities and other specialty shops without changing the area’s overall...

  5. Sammalvuori

    Urban projects / Local detailed plans

    The aim of the local detailed plan is to zone the Sammalvuori area mainly for recreational use. Additionally, the option of building more housing units around the western edges of the area will be...

  6. Updating parking space standards on Maakravunkuja

    Urban projects / Local detailed plans

    The phased detailed plan is used to update the parking regulations to match the current calculation guidelines. Proposal is available for public review 19.2.–4.3.2024.

  7. District heating pumping station on Riilahdentie

    Urban projects / Local detailed plans

    The amendment to the local detailed plan makes it possible to place a district heating pumping station in Kaitaa. The planning will take account of integrating the building into its surrounding green...

  8. The City of Espoo’s Public Works Department has started to prepare street and park plans for the section of the Finnoon keskus detailed plan that has entered into force. The planning covers the...

  9. A new electrical substation in Finnoonlaakso

    Urban projects / Local detailed plans

    A new main grid substation is planned in Finnoonlaakso on the northern side of Länsiväylä. The new electrical substation and transformer substation will be located on the western side of the current...

  10. Alakartanontie and Soukantie are collector streets. Soukankuja and Kastevuorenkuja are existing residential streets. The streets will be renovated, and their pedestrian and cycling arrangements will...

Next
  1. 1
  2. 2
  3. 3
  4. 8